Details: clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per mord specification for rural roads clause 201 by manual means as per the direction of the engineer in charge. labour for scraping cleaning the road for laying built up spray grout in one layers 37.5 mm thick applying tack coat using 3 kg of bitumen , 0.45 of 25 mm to 40 mm size h.g metal and 12 kg of grade bitumen for10 sqm.in each layer with 0.12 of 12 mm size h.g.chips as key stones spreading and laying including heating pouring bitumen metal and chips and rolling with prr with all labour t & p etc. complete. providing and applying primer coat with bitumen emulsion (ss-1) on prepared
Sector: RDPR