Details: earth work in hard soil in excavation of foundation including rough dressing and levelling the bed within 1.50m initial lift etc as per direction of engineer-in-charge. supplying & filling in foundation and plinth with sand well watered and rammed etc complete as per the directions of the engineer in charge cc (1:3:6) with 40 mm hgcb metal (hard granite crusher broken) rcc work of m20 grade with 20mm and down grade black hard granite(c.b) stone chips including all cost,carriage&labour, hoisting and laying with centering and shuttering etc complete as per the directions of the engineer in charge.in rcc foundation , column bases and footings. in plinth beam in beams and columns in lintel band roof slab chhaja window seal band supplying , fitting and placing uncoated hysd bar reinforcement complete as per drawing and technical specifications and directions of the engineer in charge. brick work with fly ash bricks 25cm x 12cm x 8cm size having crushing strength not less than 75kg/cm2 in
Sector: Water supply and Sewerage