Details: earth work in excavation of all kinds of soil filling foundation with sand well watered and rammed c.c (1:3:6) with using 40mm h.g. metal r.r h.g stone masonary in c.m. (1:6) c.c (1:2:4) with using 12mm size h.g. chips cost of m.s. rod including all t& p. etc. taking 1.2 qtl. per of concrete qty. as per item no. 5 c.b. brick masonary in c.m. (1:6) 20mm c.p. over stone masonary. 16mm c.p. over brick masonary. centering shuttering for concrete works. flooring with vertified tiles including first floor white wasing with using birla white. cost door, window, and front gate and sky light grills cost of electricity 5% of total estimated cost add gst 18% of total estimated cost add cess 1% of total estimated cost
Sector: Forest and Environment