Details: cleaning the grass and removal of up to a distance of 50 m out side the periphery of the area etc complete as per direction of eic. cleaning the existing black topped surface with removal of foreign materials with brooms or soft btrushes and finally dusting with old gunny bages and/or compressed air to receive bituminous etc complete as per direction of eic. providing, laying, spreading and compacting stone aggregate specific size to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel roller 8-10 tonnes in stages to proper grade and camber the voids with small stones and hand packing the same to proper camber, applying and brooming requsite type of screening / binding materials filling up interstices of coarse agreegate, watering and compacting to the required density as per clause 404 of mosrt&h specification for road and bridge work etc all complete including cost, conveyance, royalty and taxes of all materials wit
Sector: RDPR