Details: clearing and grubbing the road land including uprooting rank vegetation grass bushes shrubs etc complete. dismantling rcc slab, column, beam etc. and removing debris away form work site. etc. complete providing and laying cement concrete wearing course rcc m30 grade complete as per drawing and technical specifications. earth work in excavation of foundation in hard soil within the initial lead & lift including dressing & levelling the bed & depositiong the excavated earth away from the site etc. all complete as per the direction of engineer in charge. providing cutting, bending, binding and tying the grills and placing in position including cost, covenyance and royalty of all materials and cost of all labour etc. complete filling sand-supplying & filling good clean river sand of approved quality including watering to complete saturation & ramming complete with all leads & lifts including cost, conveyance, royalty & taxes of all materials & cost of all labour & t&p required for the wor
Sector: RDPR