Details: earth work in excavation of foundation sand filling p.c.c(1:3:6) p.c.c(1:3:6) for filler wall m20 for column base &plinth m20 for lintel ,chajja,column,beam &roof slab rigid smooth centering for rcc works includingfalse work and dismantling them after casting rcc column column base rcc column from pl to rl lintel beam roof beam slab & chajja brick work with flyash brick c.m (1:6) in super structure cutting ,bending ,binding of ms rod and llaying in position 12 mm thick cp with c m (1:6) over brick work 16 mm thick cp with c m(1:6) over brick work mild steel doors and windows supplying,fitting and fixing of two track upvc sliding windows fitting ,fixing of doors &windows painting two coats over a coat of primer to doors &windows including cost of enamal paint finishing walls with plastic emulition paint of approved shade on new work two coats incluiding cost of paint wall painting two coats with 100% acrylic emulsion paint(1st quality) exterior grade of approved make and shade manufa
Sector: Water supply and Sewerage