Details: loosening, levelling and compacting original ground supporting embankment to facilitate placement of first layer of earth, scarified to a depth of 150mm, mixed with water upto omc and then compacted by rolling so as to achieve minimum dry density as given in table 300-2 for embankment construction & clause 305 of mosrt&h specification for road and bridge work including all cost of labour charges, t&p, hire and running charges of all machineries, cess, taxes of all matarials excluding gst etc. complete as per direction of the engineer-in-charge. earth work in excavation of foundation in all kinds of soil including stoney earth and gravel mixed with boulders not exceeding 0.014 in volume, d.i.rock & slushy soil with all leads, lifts, delifts including dressing and leveling the bed to design section and disposal of excavated materials for filling in river bank portion with all leads, lifts and delifts including dewatering, shoring, shuttering and propping of bullah piles and
Sector: Irrigation