Details: loosening, levelling and compacting original ground supporting embankment to facilitate placement of first layer of earth, scarified to a depth of 150mm, mixed with water upto omc and then compacted by rolling so as to achieve minimum dry density as given in table 300-2 for embankment construction & clause 305 of mosrt&h specification for road and bridge work including all cost of labour charges, t&p, hire and running charges of all machineries, cess, taxes of all matarials excluding gst etc. complete as per direction of the engineer-in-charge. earth work in excavation in any approved type of soil in approved borrow area free from logs, stumps, roots or any other ingredients likely to deteriorate or effect the stability of bed, bank by mechanical means, loading into & transportation by mechanical means and unloading soil with all leads & lifts on properly prepared & scientifically approved surface free from weeds, roots and shrub jungles ,including, spreading & leveling the ea
Sector: Irrigation