Details: clearing shrub jungle uprooting stumps of small bushes & trees below 1.00 m. girth, clearing the site with cost of all labour, t&p, workers welfare cess etc. complete as per direction of the engineer -in- charge. excavation of foundation in all kinds of soil to proper section and profile with all leads, lifts and delifts including dressing and levelling the bed to proper and level and making it fit for laying concrete and depositing the excavated materials away from the work site with all leads, lifts and delifts including dewatering if necessary from foundation with all labour and t&p required for the item complete in all respect as directed by engineer-in-charge. filling of foundation and plinth with sand watered and rammed including all cost, conveyance and labour t&p required for the work etc.complete in all respect as directed by the engineer in-charge cement concrete m15 with 20 mm size crusser broken granite metal & down graded of approved quality quarried and free from weat
Sector: Irrigation