Details: earth work in excavation of structure as per drawing and technical specification including setting and construction of shoring and bracing, removal of stumps and other deleterious matterials dressing sides and bottom and back filling withapproved material etc. complete (including dewatering shoring and shutterings) including all labour, t&p etc. complete as per direction of the engineer-in-charge providing sand filling in foundation trenches as per drawing and technical specification including cost of all materials, labour, t&p etc. complete as per direction of the engineer-in-charge. p.c.c m-15 nominal mix in foundation with crushed stone aggregates 40mm nominal size mechanically mixed, placed infoundation and compacted by vibration including curing for 14 days including dewatering etc. as per drawing and technical specification including all cost etc. complete as per direction of the engineer-in-charge reinforced cement concrete m-25 nominal mix in foundation (upto gl) with crushe
Sector: Road development