Details: clearing shrubs & jungles uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier & disposal of unserviceable materials by manual means & stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal & disposal of top organic soil not exceeding 150 mm in thickness as per direction of eic. earthwork excavation for foundation of structure upto 3m depth as per drawing & technical specification including setting out construction of shoring & bracing, removal of stumps & other deleterious matter, dressing of sides etc all complete as per direction of eic supplying & filling of good quality river sand in road work of 15.0 cm (6”) thick layers including watering & ramming including all cost , conveyance, royalty, cess & taxes of the materials, labour with t & p required for the work etc. complete & as per the direction of eic. providing cement concrete (1:3:6) of in road work us
Sector: RDPR