Details: removing old grading from roof slab cleaning the surface lowering and removing the debris with in 50 m lead. dismetalling old and damaged cement or lime plaster & removing the debris within 50m lead etc. complete. dismetalling and removing 2.5cm thick a.s flooring including stacking the useful materials for reuse & removing the debris within 50m lead etc. complete. dismetalling and removing doors, windows, ventilators including removal of frame hinges, fastenings and stacking the same for reuse and removing the debris within 50m lead. (vide a/r page219 item no. 18.) 16mm thick cement plaster (1:6) over brick masonry including racking out joints watering, curing, cost, conveyance,royality and taxes of all materials and labour etc. completed in all respect. i (ground floor) 16mm thick cement plaster (1:6) over brick masonry including racking out joints watering, curing, cost, conveyance,royality and taxes of all materials and labour etc. completed in all respect. first floor 12 mm thick
Sector: Education Misc