Details: earth work in excavation of foundation in all kinds of soil within initial lead and initial lift including rough dressing and breaking rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3 m in depth including cost and conveyance, royalty & taxes of all materials and cost of all labour t&p required for the work,labour welfare cess@1% etc. complete as per the direction of the eic. supplying, filling sand in foundation & plinth well watered and rammed including cost, conveyance, taxes, royalty of sand, labour & t&p, labour welfare cess@1% etc. complete as per specification and direction of the eic. cement concrete (1:4:8) by using 40 mm size hard granite crusher broken chips of approved quality and form approved quarry including lowering laying concrete, watering and curing etc. complete for required levels laid in layers including cost and conveyance, royalty & taxes of all materials and cost of all labour t&p required for the work,labour welfar
Sector: Forest and Environment