Details: clearing shrub jungles and uprooting stumps and small bushes and trees of below 1 meter girth on pre-measurement including removal of debris and depositing the same clear of work site with all leads, lifts and de-lifts etc., with supply of all labour and t&p required for the work etc., complete in all respect as directed by the engineer-in-charge. earth work in excavation in hard soil with all leads, lifts, and delifts to proper profile and required depth of cutting and depositing the excavated earth to proper embankment profile with all leads lifts and delifts including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layer not exceeding 0.30m in depth and depositing the balance soil if any clear of work with all leads lifts and delifts etc.complete as directed by the engineer-in-charge.(measure ment will be taken on the finished approved level section.1/6 th volume to be deducted towards settlement) excavation of any approved type of soils in approved borrow a
Sector: Irrigation