Details: clearing shrub jungles and uprooting stumps and small bushes and trees of below 1 meter girth on pre-measurement including removal of debris and depositing the same clear of work site with all leads, lifts and de-lifts etc., with supply of all labour and t&p required for the work etc., complete in all respect as directed by the engineer-in-charge. excavation of any approved type of soils in approved borrow area by mechanical means loading into and transportations by mechanical means and unloading the soil within initial lead of 1 km on properly prepared and scientifically approved surface, including spreading and leveling the earth in 22.5cm (9") layers to make ready for watering and compaction with sheep foot roller and dozers but excluding watering and compaction in dams and for all heights including construction, maintenance, watering and lighting of haul road adn borrow area etc,complete as per the direction of engineer-in-charge.(measurement of the fill to be taken on the fi
Sector: Irrigation