Details: clearing grass and removal of up to a distance of 50 metres outside the periphery of the area etc. complete as per direction of the engineer in charge. road -a road -b road -c road -d road -e road -f road -g road -h providing and laying moorum on shoulder / berm including all cost and conveyance of all materials and labour charges etc complete for finished item of work as per the direction of eic. road -a road -b road -c road -d road -e road -f road -g road -h scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified materials with in all lifts and lead upto 1000 metres etc complete. road -g cleaning the existing black topped surface with removal of foreign materials with brooms soft brushes and finaly dusting with old gunny bags or compressed air to receive bituminous treatment as per direction of e i c. road -a road -b road -c road -d road -e road -g road -h providing, laying, scraping, cleaning the road surface applying tack coat using 3.
Sector: RDPR