Details: cleaning shurb jungle and uprooting strump and small bushes and trees of below 90cm grith on pre-measurement and depositing the debries clear of work site with all lead and lift complete as per directed by the eic. dismantling of cement concrete including stacking the useful materials for reuse & removing the debris within 50m lead etc. complete as directed by the engineer-in-charge. excavation, loading , unloading and carriage by mechanical means of all kind of soil including moorum. stoney earth, gravel etc. interspread with boulders up to 1/2 in size with all lifts and delifts including trimming of slopes and bed to design section and depositing the excavated materials away from work site as per the specification and as directed by eic within an initial lead of 1 km. from the place of excavation complete. filling in foundation and plinth with sand well watered and rammed with all leads and lifts including making arrangements for carriage of water etc. complete as directed by the
Sector: Irrigation