Details: cleaning shurb jungle and uprooting strump and small bushes and trees of below 90cm grith on pre-measurement and depositing the debries clear of work site with all lead and lift complete as per directed by the eic. rough stone dry packing in aprons and revetments to all heights with hard stone of size 30cm and above, weight not less than 40kg/piece including cost,conveyance, royalty to proper and level complete in all respect as directed by the engineer-in-charge. collecting supplying and spreading moorom on dam top with cost conveyance royalty and labour charges including watering compacting with light h.r.r etc complete with all labour, t&p required for the work with labour welfare cess complete as per specification and direction of the eic. excavation in all kids of soil including moorum stoney earth gravel excepting all kinds of rock & boulders exceeding 0.014 in volume for dam base stripping cut-off trenches, drains including all laboour etc. complete. ramming & rolling of ear
Sector: Irrigation