Details: clearing grass and removal of up to a distance of 50 metres outside the periphery of the area etc. complete as per direction of the engineer in charge. flank dressing to proper camber including t&p materials etc. complete as per direction of the engineer in charge. providing, spreading & compacting moorum in berms including watering and compacting to the required density in o,m.c with prr including cost, conveyance & royalty of materials, labour, t&p required for the work and taxes etc complete as per the direction of engineer- in- charge. cleaning the existing black topped surface with removal of foreign materials with brooms or soft brushes and finally dusting with old gunny bags and/or compressed air to receive bituminous treatment providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 503 of mosrt&h specifications for road &
Sector: RDPR