Details: earth work in hard soil or gravelly soil within 50 m initial lead and 1.50m initial lift including rough dressing and breaking clods to maximum 5 to 7 cm size and laying in layers not exceeding 0.30m depth & levelling and dressing the bed etc.complete as directed by the engineer in charge . earth work excavation in foundation in hard soil within initial lead & initial lift including dressing and levelling the bed to proper and level and making it fit for laying concrete and depositing the excavated materials away from the work site with all leads, lifts and delifts including dewatering if necessary from foundation with all labour and t&p required for the item complete in all respect as directed by engineer-in-charge. filling in foundation & plinth with sand well watered and rammed in layers of 23.5cm thick including cost, conveyance of materials and supply of all labour, taxes as per prvailing norm and t&p, dewatering if required for the work etc. complete and as directed by
Sector: Irrigation