Details: earth work in hard soil for foundation within 50m initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the engineer-in-charge. cleaning shurb jungle including uprooting stumps & small bushes and removal of up to a distance of 50m outside the periphery of the area. excavation loading unloading and carrage by mechanical means of all kinds of soil including stoney earth gravel & moorum etc interspread with boulders up to 1/2 size with all lifts and delifts including trimming of slopes and bed to design section and dipositing the excavated materials away from work site as per the direction of engineer in charge within an initial lead of 1 km from the place of excavation complete cement concrete m-15 grade in crushed granite coarse aggregate of size 20mm size & down graded to be mixed in concrete mixer including cost, conveyance and royalty of all materials,machi
Sector: Irrigation