Details: removing old lime or cement plaster from walls including raking outjoints 12 mm deep and removing the debris within 50 m leads etc complete as per the direction of the engineer nn charge finishing wall with water proofing cement paint of approved shade to new work two coat to give an even shade including cost of paint & all labour , taxes etc complete as per direction of engineer in charge.. distempering two coats to walls with distemper of approved shade on new work to give an even shade inculding cost of distemperand labour and t&p required for the work etc complete as per the directoin of theeic painting two coats with any approved type of paint over on the new wood work and iron work including cost of the paint sand papering polishing the surface with cost of all materials labour and t&p required for the work etc complete as per the direction of the eic fitting &fixing of m. s.windows grill as per approve design including cost conveyance , labour, taxes and t&p etc complet
Sector: RDPR