Details: clearing shrub jungles uprooting stumps and small bushes and trees 1 m girth on premeasurement …etc complete as per the direction of the engineer- in -charge earth work in hard soil within 50m initial lead and 1.5m lifts , laying in layers not exceeding 0.3m in depth in afflux bundh including rough dressing & breaking clod minimum 5cm to 7 cm…. etc complete in all respects as directed by the engineer-in-charge of the work.. ( measurement will be taken on finished level section and payment will be made after deduction of 1/8 voids for settlement) excavation of foundation in all kinds of soil to proper section and profile with all leads, lifts and delifts including dressing and levelling the bed to proper and level and making it fit for laying concrete and depositing the excavated materials away from the work site with all leads, lifts and delifts including dewatering if necessary from foundation with all labour and t&p required for the item complete in all respect as directed by e
Sector: Irrigation