Details: clearing grass and removal of rubbis up to a distance of 50 m out side the periphery of the area as per direction of engineer in charge. flank dressing to proper camber etc. complete as per direction of engineer-in-charge providing labour for laying sub-base in layers not exceeding 100mm watering and compacting to the required density in o.m.c with prr including cost, carriage, conveyance and royalty of moorum etc. complete as per direction of engineer-in-charge. providing laying spreading and compacting stone aggregates of sizes to water bound macadam specification including spreading in uniform thickness hand packing rolling with 3 wheeled steel roller 8-10 tones in stages to proper grade and camber applying requisite type of screening materials to fill up the interstices watering and compacting to required density etc complete. grading ii (using moorum and gravel) grading iii ( using moorum or gravel ) cleaning the existing grannular base surface including removal of binding materi
Sector: RDPR