Details: earth work in hard soil or gravelly soil within 50m. initial lead and 1.5m. initial lift including rough dressing and breaking clods to maximum 5cm.to 7cm. and laying in layers not exceeding 0.3 m. in depth asper direction of the engineer-in-charge. providing and filling sand blanket with good river sand and wel watered & rammed etc complete as per direction of engineer-in-charge. providing and laying (1:3:6) in foundation and floors using 4 cm. size black hard crusher broken granite stone metal and sand of approved quality and from approved quarry including laying concrete in layers not exceeding 15cm in depth, ramming, watering construction of r.c.c.m 25 grade in f&f using 12mm size cb/hb chips of approved quality including cost, conveyance, taxes & royalty of all materials and labour with t&p etc. complete in all respect. supplying fitting and placing uncoated hysd steel reinforcement works using hysd (fe-415) (sail only) steel reinforcement as per drawing and technical speci
Sector: RDPR