Details: clearing grass and removal of up to a distance of 50 mtr outside the periphery of the area and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness as per specification and as per the direction of engineer -in –charge. scarifying the existing bituminus road surface to a depth of 50m and disposal of scarified material within all lifts and lead upto 1000mt. earth work in excavation of ordinary soil with within 50m initial lead & lift including rough dressing breaking clods and leveling bed and depositing the excavated materials away from the working area etc. complete as directed e.i.c. providing laying spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the materials with water at omc in mechanical mix plant carriage of mix etc. providing and applying primer coat with bitumen em
Sector: RDPR