Details: 10 user septic tank earthwork in all kinds of soil in excavation of foundation trenches within 50m initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.30m in depth etc all complete as per direction of the e.i.c. initial lift upto 1.5 mtr from 1.5 mtr to 3.0 mtr depth supplying all materials, labour, t&p and filling in foundation and plinth with river sand well watered and rammed including conveyance of all materials to work site, payment of royalty, taxes etc all complete as per the direction of the e.i.c. supplying all materials, labour, t&p and providing cement concrete (1:3:6) with 40mm h.g metal including watering, curing and conveyance of all materials to site payment of royalty, taxes etc all complete as per p.h specification and direction of the e.i.c. supplying all materials, labour, t&p and providing plain cement concrete (1:1.5:3) with 12mm size h.g chips including watering, curing and
Sector: RDPR