Details: dismantling and removing 2.5cm th a.s.flooring including stacking the useful materials for reuse and ramming the debris with in 50m lead etc with all labour, t&p and cess etc. complete in all respect as per specification and direction of the engineer-in-charge. earthwork in excavation of foundation in all kinds of soil including dressing and levelling the bed to required depth and width and deposting the excavated materials away from work site as directed by engineer in charge. filling in foundation and plinth with sand well watered and rammed including cost conveyance and royalty etc. complete. cement concrete (1:3:6) with 4cm size hard granite metal in foundation and plinth. laying of interlocking concrete block pavements having thickness 80 mm as per drawings and technical specification clause 1504.(including m-30 edge blocks of both side) removing old lime or cement plaster from walls including racking out joints 12mm deep and removing debris etc. with all labour, t&p and cess etc
Sector: RDPR