Details: providing 300mm dia.and 6m long single under ream pile foundation with rcc-m20 using 12mm size black hard granite chips including cost of boring but excluding cost of ms/tor steel and labour charges for cutting , bending and binding of steel. (total nos of piles) earth work in excavation of foundation trenches in hard soil including dressing of sides and levelling the bed up to the required depth and depositing the excavated materials away from the work site within 50m initial lead & 1.5m initial lifts with sundries & t&p required for the work complete including cost of all labour,labour cess,t&p,sundries etc. as directed by the engineer in charge. (hard soil ) filling in foundation trenches and plinth, with excavated earth including laying the earth in layers not exceeding 23.5 cm thick ramming & watering with all leads & lifts including cost of all labour,t&p completed as directed by the engineer-in-charge. supplying and filling in foundation and plinth with good quality river sand
Sector: PWD