Details: clearing and grubbing of road land including uprooting rank vegetation grass, bush, shrubs and trees of girth up to 300mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness with all labour, t&p, taxes & cess etc complete as per direction of engineer-in-charge. clearing the existing granular base surface including removal of binding materials and other foreign materials with wire bushes and small picks, sweeping with brooms or soft brushes and finally dusting with old gunny bags and /or compressed air to recieved bituminous. etc. complete as per specification and direction of the engineer-in-charge construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site by mechanical means within a lead of 5 kms spreading, grading to r
Sector: RDPR