Details: clearing and grubbing of road land including uprooting rank vegetation grass, bush, shrubs and trees of girth up to 300mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness with all labour, t&p, taxes & cess etc complete as per direction of engineer-in-charge. providing, laying, spreding and compacting stone aggregates of specific sizes to water bound macadam specification including spresding in uniform thickness, hand packing,rolling with three wheeled steel roller 8-10 tonnes in stage to proper grade and camber, applying and brooming requisite type of screenig/binding materials to fill up the interstices of coarse aggregates, watering and compacting to the required density as per clause 404 of mosrt&h specifications for road & bridge works(4th revision) with all labour, materials,
Sector: RDPR