Details: labour for dismantling & removing of old door & window choukath including cost of labour t&p required for the work etc complete. engaged labour for cleaning debries & shifting furniture including cost of all labour,t&p required for the work etc complete back filling of surplus excavated earth behind structures by manual means with initial lead 50m and lift of 1.50mtr including cost of all labour t&p required for the work etc. complete as directed by engineer-in-charge supplying fitting and fixing pre moulded decorative corner gypsum beading (112x80mm) including cost of all materials, labours, t&p etc complete. providing, fitting and fixing of 8mm thick wooden flooring with approved shed over layer of 6mm thick foam including proper lucking system including cost of all materials, conveyance, labour, t&p etc complete providing fitting and fixing of upvc sliding windows with 5mm clear float glass of two track 100mm l.g. profile as per approved specification including all cost conveyanc
Sector: PWD