Details: clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material 1% cess etc. complete as per specification and direction of the engineer-in-charge construction of embankment with approved material obtained from borrow pits with all leads and lifts, transporting to site with mechanical means with in a lead of 5kms spreading, grading to required and compacting to meet requirement of table 300-2 1% cess etc. complete as per specification and direction of the engineer-in-charge providing, laying, spreding and compacting stone aggregates of specific sizes to water bound macadam specification including spresding in uniform thickness, hand packing,rolling with three wheeled steel roller 8-10 tonnes in stage to proper grade and camb 1% cess etc. complete as per specification and direction of the enginee
Sector: RDPR