Details: clearing and grubbing road land including uptooting rank vegetation, grass, bushes, shrubs, saplings and trees girth upto 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposalof top organic soil not exceeding 150 mm in thickness. earthwork in excavation in hard soil as per drawing and technical specification clause 305 and 1104 of mord includding setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto all lead & lift, dressing of sides and bottom and back filling with excavated suitable material upto 3mt. as per direction of engineer-in-charge. filling in foundation and plinth with fine course sand in 23.5cm thick layers free from organic and materials,well watered and rammed including all cost,conveyance,royalty taxes all materials and all labour t & p articles required for the
Sector: RDPR