Details: earthwork in excavation in hard soil as per drawing and technical specification clause 305 and 1104 of mord includding setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto all lead & lift, dressing of sides and bottom and back filling with excavated suitable material upto 3mt. as per direction of engineer-in-charge. filling in foundation and plinth with fine course sand in 23.5cm thick layers free from organic and materials,well watered and rammed including all cost,conveyance,royalty taxes all materials and all labour t & p articles required for the work including 1% cess etc, complete as per specification and direction of the engineer-in-charge. plain cement concrete in open foundation complete as per drawing and tecnical specifications with cost of all labour and materials. pcc gr m-15 etc, complete as per specification and direction of the engineer-in-charge. without centering & shuttering with centering & shutterin
Sector: RDPR