Details: clearing grass and removal of up to a distance of 50 meters outside disposal of unserviceable materials with all leads, lifts and dellifts with cost of all labour, t & p, labour welfare cess etc. complete as per the excavation of any approved type of soil in borrow area, loading into transport vehicle manually and transportation of earth by mechanical means and unloading the same over the approved surface of embankment in proper profiles with all leads, lifts, delifts etc. including rough dressing and breaking the clods to maximum 5 cm to 7 cm size including removal of roots, bushes, other deleterious materials from transported earth with all cost, carriage, royalty,dmf, emf, additional charges , labour welfare cess & laying in layers not exceeding 22.50 cm in depth with hire & running charges of all machineries with all labour & t&p, taxes required for the work etc complete in all respects as per specification and the direction of the engineer-in-charge. (measurement to be take
Sector: Irrigation