Details: dismantling stone masonry in lime or cement mortar under 3mtr height including stacking the useful materials for reuse and removing the debries with in 50 mtr lead with cost of all labour, t & p & cess required for the work etc complete as per direction of engineer-in-charge. rcc of m-25 of controlled quality having minimum cube strength of 250 kg/cm2 of 150 mm cubes at 28days with hard crusher broken granite chips of 20mm size and down graded consistence with strength and cover of concrete of approved quality from approved quarry including hoisting lowering and laying concrete in layers to the required thickness and compacting each layers by means of as per direction of engineer in charge including watering with cost and carriage of water, curing and steel shuttering and finishing the exposed surface smooth providing grooves and beads where necessary with working of pumps and other t&p machineries as may be required for the work including cost, conveyance, royalty taxes etc, of all
Sector: RDPR