Details: intake well & pumping arrangements design, drawing, construction, testing & commissioning of 10m dia rcc intake well (upto 20m depth) including dewatering, coffer dam, 5.5m height pump house on the well, 10 ton capacity eot crane arrangement with 3.50 m width rcc/ms walk way up to 50 m etc., all complete as per scope, specification & direction of engineer-in-charge. stone pitching at intake well supplying all labour, t&p and earth work in excavation of all kinds of soil with in 50m intial lead and 1.5m intitial lift including rough dressing and breaking the clods to maximum 5cm to 7cm and laying in layers not exceeding 0.30m in depth as per direction of e.i.c random rubble h.g. stone masonry in cement mortar (1:6) in foundation and plinth. 2.5cm. dam proof course with c.c (1:2:4) using 12mm. size hard broken granite chips supplying all labour, t&p for earth filling by mechanical means from approved quarry, compacting, watering including transportation, royalty all complete as per dir
Sector: Water supply and Sewerage