Details: farmer rest shed (ground) excavation for road work in soil with hydraulic excavator of 0.9cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections and transporting to the embankment locations with all lifts & leads up to 1000m.as per approved drawing & technical specifications and as per clause - 301 of mort&h specifications for road & bridge works (5th revision). filling in foundation trenches and plinth, with excavated earth including laying the earth in layers not exceeding 23.5 cm thick ramming & watering with all leads & lifts including cost of all labour,t&p completed as directed by the engineer-in-charge. supplying and filling in foundation and plinth with good quality river sand including wat
Sector: PWD