Details: clearing grass and removal of to adistance of 50m outside periphery of area on both sides of the road to facilitate widening of berms, disposal of the stuff including all labour, tandp articles required for the work etc.complete as per irc specification for road works and direction of engineer-in-charge. scarifying the existing bituminous road surface to a depth of 50mm and disposal of scarified materials with in all lifts and lead etc complete as per the direction of engineer-in-charge. reworking the scarified bituminous surface suitably after supplementing the base materials with sand and water compacting with prr including hire and running charges of prr etc complete as per direction of the engineer-in-charge. providing 75mm thick compacted layers of specified grades of wbm irc grade-iii 53mm to 22.4 mm, laying in position, spreading in uniform thickness. hand packing, applying and booming requisite type of screening blinding materials, waterings etc.and compacting in stages
Sector: RDPR