Details: earth work excavation in hard soil or gravelly soil within 50m initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per direction of the e-i-c. filling in f & p with sand watered and rammed. per 1 (data for 100cum) cement concrete(1:3:6) using 40mm.size c.b. chips including all cost etc complete cement concrete(1:2:4) using 12mm.size c.b. chips including all cost etc complete supplying, placing, fitting uncoated hysd bars reinforcement complete as per the drawing and specification.all labour t&p etc complete.a/ r page - 52, sl.(9a) clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not e
Sector: RDPR