Details: earth work in excavation of foundation trenches in all kind soil including dressing and leveling the bed upto the required depth and depositing the excavated materials with all leads and lifts t&p shoring & shuttering if required etc.complete as directed by the engineer-in-charge. filling foundation and plinth with sand well watered and rammed including cost & conveyance of materials, labour ,t&p, royalty & taxes etc.complete as per direction of the engineer-in-charge. providing pcc (1:3:6) (without shuttering) mix with 40mm nominal size stone aggreagate in foundation up to depth of 1.50m bellow ground level and up to a height of 1.50m above ground level/ bed level including cost , conveyance, royalty, taxes, of all materials, labour, t & p watering, curing etc.complete & as per specification & direction of the engineer-in-charge. providing pcc (1:3:6) (with shuttering) mix with 40mm nominal size stone aggreagate in foundation up to depth of 1.50m bellow ground level and up to a h
Sector: RDPR