Details: cutting of shurb from the road way or with in r.o.w including disposal of wood and leaves to suitable location as per technical specification & as per direction of the engineer in charge. construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site by mechanical means within a lead of 5kms, spreading, grading to required and compacting to meet requirement of table 300-2 & clause 305 of mosrt&h specifications for road and bridge works (4th revision) with cost of all labour, t&p and with cess, royality and as per direction of engineer-in-charge. flank dressing to proper camber on either sides of road surface including all labour,t&p,cess etc required for the work etc completeas per direction of engineer-in-charge. clearing the existing black topped surface with removal of foreign materials with brooms or soft brushed and finally dusting with old gunny bags and /or compressed air to receive bituminous including all lab
Sector: RDPR