Details: earth work in excavation of fondation in hard soil within the initial lead & lift including dressing & levelling the bed & depositiong the excavated earth away from the site etc. all complete as per the direction of engineer in charge. filling sand-supplying & filling good clean river sand of approved quality including watering to complete saturation & ramming complete with all leads & lifts including cost, conveyance, royalty & taxes of all materials & cost of all labour & t&p required for the work etc. complete as per specification & direction of engineer in charge. pcc (1:2:4) with 12mm size hg crusher broken chips etc complete. ar-2006,p-44(rate per one ) as per the direction of engineer in charge. plain cement concrete m-15 grade in foundation complete as per drawing and technical specification as per the direction of engineer in charge. construction of un-reinforced, dowel jointed plain cement concrete pavement over a prepared sub-base with 43 grade cement @ 400kg per , coars
Sector: RDPR