Details: clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials by manual means and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per technical specification clause 201 but excluding the charges of gst etc. complete as per direction of the engineer-in-charge. providin, laying, spreading & compacting graded stone aggregate to to wet mix macadam specification including pre mixing the material with water at omc in mechanical mix plant, carriage of mixed material by tipper to site, laying in uniform layers with paver in sub base/base course on well prepared surface & compacting with vibratory roller to acieve the desired density as per clause 406 of mosrt & h specifications for road & bridge works.(4th revision) etc.
Sector: RDPR