Details: clearing shrubs & jungles uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier & disposal of unserviceable materials by manual means & stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal & disposal of top organic soil not exceeding 150 mm in thickness as per direction of eic. dismentalling of removing r.c.c column & beam from roof slab & stair case including racking out joint 12mm deep and removing the debris within 50m lead. etc .as per direction of eic construction of rcc railing of m30 grade in-situ with 20 mm nominal size aggregate, true to line and grade, tolerance of vertical rcc post not to exceed 1 in 500, centre to centre spacing between vertical post not to exceed 2000 mm, leaving adequate space between vertical post for expansion, complete as per approved drawings and technical specifications. painting two coats with any approved enamel paint over
Sector: RDPR