Details: clearing and grubbing road land in area of light jungle including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth upto 300mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned upto a lead of 1000metres including removal and disposal of top organic soil not exceeding 150mm in thickness as per clause 201 of mort&h specifications for road & bridge works (5th revision)and as per direction of engineer-in-charge. earthwork in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work as per clause 304 of mort&h specifications for road & bridge works (5th revision) and as per direction of engineer-in-charge
Sector: PWD