Details: earth work in excavation in all kinds of hard soil in foundation within initial lead and lift including rough dressing and breaking clods to maximum 5cm. to 7cm. and layng in layers not exceeding 0.3m in depth with ordinary compaction by prr including hire & running charges of prr and royalty etc. complete asper specification & direction of the engineer in charge. filling in foundation and plinth including quarring ,collecting, conveying, supplying sand and watering incuding cost conveyance roylaties taxes of all materials and labour etc complete as per direcation by the engineer-in-charge. cement concrete 1:4:8 using 4cm size bhg c.b. metal including cost conveyance royalaties taxces of all materials etc complete as per irection by the engineer-in-charge. fly ash brick masonry in c.m. (1:6) using fly ash brick of size (23cmx11cmx8cm)of crushing strength not less than 35kg/cm2 in superstructure etc complete as per direction by the engineer-in-charge. 12mm thick cement plaster (1:6
Sector: RDPR