Details: earth work in excavation of foundation in hard soil within initial lead of 50m and lift of 1.5m including dressing & leveling the bed & depositing the excavated earth at places away from work site with all leads & lifts including cess and cost of all labour t&p & dewatering if required for the work etc. complete and as per specification and direction of engineer-in-charge supplying and filling in foundation with course sand well watering and ramming with cost, conveyance, royalityof all materials, and labour with t&p required for the work including cess etc complete. (measurement will be taken on finished compacted section only) as per direction of engineer-in-charge. providing cement concrete of proportion (1:3:6) using 40mm size clean hard black granite crusher broken metal of approved quality and from approved quarry including hoisting lowering and laying concrete in layers not exceeding 15cm (6") thick to the required level ramming, watering & curing etc. complete including cost &
Sector: RDPR