Details: supplying all materials and t&p for manual labour charges for excavating bore holes for single under reamed piles of 250 mm dia centre to centre length including casting & laying of ms rod etc. earthwork in excavation of foundation in hard soil including dressing & levelling of bed within initial lead of 50 mtr. & lift of 1.5 mtr. etc. complete as per the direction of the engineer-in-charge. earthwork in excavation for 200 mm & 160 mm dia hdpe under ground pipe line for foundation in hard soil such as hard stiff clay, stiff black cotton, hard red earth, sahles, moorum ordinary gravels etc. within 50 m. initial lead and 1.5 m. initial lift including rough dressing and levelling the bed and depositing the excavated materials within initial lead at nearby the worksite for reuse including breaking clods and stacking rubble for spreading and leveling as the case may be etc. complete as per direction of the engineer-in-charge. (excavation by me
Sector: Irrigation